Free Resource
Get the right photos and field data the first time — so your plan set is accurate and your project doesn’t stall.
Enter your email to get the checklist plus future tools as we release them.
Or skip and download directly →
Free resource from HPH Solutions — 25+ MW of solar and storage projects designed and permitted across all 50 states.
A complete, printable reference your field team can take to every site visit.
Every angle, obstruction, and detail your design team needs to model the array accurately.
Panel, breaker, meter, and service details for code-compliant electrical design.
Documentation for backup loads, subpanel routing, and storage system placement.
Property orientation, shading sources, access points, and overall site conditions.
Key dimensions and distances to capture on site for accurate plan set production.
The top 10 most frequently missed items with explanations of why they matter.
Solar sales reps and site surveyors
Small installer owners and permit coordinators
PMs and operations / admin staff
Newer companies building out internal processes
Missing or poor-quality site survey photos are one of the most common reasons plan sets get delayed, require revisions, or start with inaccurate assumptions. This checklist gives your field team a repeatable, printable reference for every site visit.
Want more tools like this? Sign up for updates.